Our company will participate in the implementation of construction work related to the reconstruction of the Hospital with the polyclinic of St. Barbora in Rožňava. The work contract was signed on both sides and the construction site was taken over on 03.03.2020. The deadline for submission of all works is scheduled for the end of March 2021.
The subject of construction work is demolition work, modification of partitions, cutting of ceramic tiles and paving, dismantling of old interior doors, as well as external windows and ceilings, removal of old paint and realization of new plaster and paintings in the building SO 01 - Urgent reception. The works will also include the modification of electrical wiring, low currents, EPS, HSP, medical gases, air conditioning, water supply and sewerage. Furthermore, a ramp for people with reduced mobility will be built and the emergency reception lift will be reconstructed.