On June 5, 2025, we took over the construction site for the project "Veľaty - Sewerage and WWTP. Construction work is to be completed by the end of this year.
The designed WWTP is located northeast of the village of Veľaty in its extravillage. It is a closed building in a fenced WWTP area. The building is rectangular in shape with a ground plan dimensions of 16.7×6.1m with a gable roof at a slope of 24 o . The building serves to accommodate and protect technological equipment, as well as to treat wastewater. The underground part of the building is made of water-resistant reinforced concrete, the above-ground part is brick and ends with a gable roof. The underground part is divided into activation tanks, settling tanks, sludge pumping stations and a sludge pit. The above-ground part of the WWTP includes a blasting room, a switchboard room and a toilet with a washbasin. The entrances to the building are from the adjacent intra-area communication designed within the SO 04 building. The lighting of the interior spaces is provided by plastic opening windows with insulating double glazing as well as artificial lighting.