Select your language

október, 2019 - február, 2022

Increase the productivity and efficiency of the hospital Poprad through reconstruction and extension

Orderer: Nemocnica Poprad, a.s.
Supplier: Chemkostav, a.s.

Basic information

The hospital building in Poprad is functional and its operation created a requirement for reconstruction of the floors of the 9th and 10th floors. Reconstruction of these floors in turn created a requirement for the location of HVAC and CH cooling equipment used for reconstructed floors, on the roof of the building, respectively. to the HVAC and CHL engine room built on the roof of the hospital building. Due to the fact that it is only an extension of the building situated in the area of ​​Hospital Poprad a.s. the existing urban design of the hospital complex remains intact. The whole object is H-shaped and is divided into a bed part, a complement and a polyclinic. The superstructure of the HVAC and CHL engine room is located above the central part, above the complement. The implementation of the construction and its course will be influenced by the allocation of funds and cooperation with the implementation of parallel projects: reconstruction of the 9th floor, reconstruction of the birth department on the 10th floor and thermal insulation of the building envelope.

 

Select your language