Select your language

august, 2014 - máj, 2017

Expressway R2 Zvolen east - Pstruša

Orderer: Národná diaľničná spoločnosť a.s.
Supplier: Chemkostav IS, s.r.o. (v združení)

Basic information

On the route of  the expressway section R2 Zvolen east - Pstruša, in a total length of 7.850 km, there are a total of seven permanent bridges, one is the overpass over the expressway and 3,500 m of anti - noise walls. Demanding is the bridge over the brook Hradná with a length of 206.8 meters, and the bridge over the railroad tracks and Slatina, long 460.6 meters. The section begins in grade-separated interchanges Zvolenská Slatina. The route is led on Zvolen basin and ends before the interchange Pstruša, beyond which continues the section Pstruša - Kriváň, which is already under construction. The basic objective is to build the capacity and modern road - an expressway for safe and smooth conduct primarily a transit and car transport solutions in those areas.

Select your language