Chemkostav, a.s. signed contract for works with Delta Construction Plus, s.r.o.. Subject of contract was project „Južné mesto – zone B1: SO03 – Residential Building A III with infrastructure and other outside objects”. Works on project will begin in November 2016 and finish in July 2018.
Complex is located in Bratislava – Petržalka, south from Panénska cesta and on north from newly build Zone C1. Whole complex contains of six residential buildings, which are composed to create semi open residential-block with little inside park. Urban design secures residential area from negative effects of future constructions in near area.
BASIC DATA OF CONSTRUCTION
Build up area SO-03 (1.PP) 2 753 m²
Gross floor area SO-03 34 066 m²
Utility area SO-03 22 300 m²
Enclosed space SO-03 102 199 m³
Number of above ground floors 12
Number of sublevel floors 2